building permits Bulgaria regulations

Building Permits in Bulgaria: What Documents You Need and How to Get Them

Architect Miglena Pförtner
Architectural design and construction documents

The Bulgarian building permit process follows specific procedures established in the Territorial Development Act (ZUT). Understanding requirements before starting saves time and prevents costly delays.

Overview of Permit Types

Bulgarian construction permits divide into categories based on project complexity:

Category 1: Major infrastructure, industrial facilities, and buildings over 15 meters height. Requires state-level approval.

Category 2: Residential buildings 4+ floors, educational and healthcare facilities. Regional administration involvement.

Category 3: Residential buildings up to 3 floors, most commercial buildings. Standard municipal processing—covers most private home construction.

Category 4-5: Minor structures, temporary buildings, and small modifications. Simplified procedures.

Most private homes fall under Category 3, which this guide focuses on.

Pre-Permit Requirements

Before applying for building permits, several preliminary steps must complete:

Land ownership documentation must be in order. Notarized deed (нотариален акт) establishes ownership. Property registry check confirms no encumbrances or disputes.

PUP compliance verification confirms your land’s building rights. The Detailed Development Plan specifies:

  • Building lines and setbacks
  • Maximum building height
  • Maximum built-up area percentage
  • Maximum total built area (including all floors)
  • Permitted uses (residential, commercial, mixed)

Visa for design (Виза за проектиране) authorizes architectural design. Apply through the municipality’s architectural department. Processing takes 14-30 days. This document specifies exact building parameters your design must meet.

Required Technical Documentation

Building permit applications require comprehensive project documentation:

Architectural Project (Part Архитектура)

  • Site plan showing building position, access, and landscaping
  • Floor plans of all levels including basement and roof
  • All exterior elevations
  • Building sections (minimum two)
  • Roof plan with drainage
  • Door and window schedules
  • Material and finish specifications

Structural Engineering (Part Конструкции)

  • Foundation design and details
  • Structural calculations
  • Reinforcement drawings (for concrete construction)
  • Connection details (for timber/steel construction)
  • Structural specifications

Electrical Installation (Part Електро)

  • Distribution board layouts
  • Circuit diagrams
  • Lighting plans
  • Socket layouts
  • External power connection details

Plumbing and Sanitation (Part ВиК)

  • Water supply layout
  • Drainage system design
  • Connection to municipal systems
  • Septic system design (if applicable)

Heating, Ventilation, Air Conditioning (Part ОВК)

  • Heating system design
  • Heat loss calculations
  • Ventilation layouts
  • Equipment specifications

Energy Efficiency Certificate

  • Thermal envelope calculations
  • Energy class determination
  • Compliance with energy regulations

Geodetic Survey

  • Topographic survey of site
  • Building stakeout plan
  • Level reference points

Fire Safety Documentation

  • Fire escape routes
  • Fire-resistant construction details
  • Fire detection and alarm systems

Application Process

The permit application follows defined stages:

Stage 1: Document Assembly Compile all technical documentation listed above. Each section requires licensed professional signatures. Architects sign architectural parts; structural engineers sign structural parts, etc.

Stage 2: Coordination Letters Obtain coordination from utility companies:

  • Electricity distribution company
  • Water supply company
  • Telecommunications (if applicable)
  • Gas supply (if applicable)

These letters confirm connection availability and technical requirements.

Stage 3: Submission Submit complete package to municipal architecture department. Include:

  • Application form (standard municipal format)
  • All technical documentation (3 copies)
  • Coordination letters
  • Ownership documents (copies)
  • Visa for design
  • Application fees

Stage 4: Review Municipal experts review documentation for code compliance. Review period is 30 days for Category 3 buildings. Reviewers may request:

  • Clarifications on technical details
  • Additional calculations or drawings
  • Modifications to achieve compliance

Stage 5: Approval or Revision If documentation is compliant, Building Permit (Разрешение за строеж) issues. If problems exist, you receive written requirements for corrections. Revised documentation resubmits for additional review.

Common Rejection Reasons

Applications frequently fail due to:

PUP non-compliance: Building exceeds permitted parameters (height, coverage, setbacks). Solution: Modify design before submission.

Incomplete documentation: Missing calculations, unsigned drawings, or absent coordination letters. Solution: Ensure completeness before submission.

Technical deficiencies: Structural calculations errors, energy compliance failures, or code violations. Solution: Correct technical issues with licensed professionals.

Ownership issues: Unclear property rights or outstanding encumbrances. Solution: Resolve legal matters before building plans.

Fees and Costs

Permit fees vary by municipality but typically include:

Application fee: 50-200 EUR (varies by municipality) Technical examination fee: Based on building value, typically 0.1-0.3% Utility coordination fees: 50-150 EUR per utility

Professional fees for documentation: Architectural project: 1,500-4,000 EUR depending on size and complexity Structural engineering: 500-1,500 EUR Other specialists: 200-500 EUR each

Complete cost breakdown includes permit expenses in total budget planning.

Timeline Expectations

Realistic timeline for residential permit:

StageDuration
Visa for design14-30 days
Design development4-8 weeks
Documentation compilation1-2 weeks
Coordination letters2-4 weeks
Municipal review30 days (statutory)
Revisions (if needed)2-4 weeks
Permit issuance1 week
Total3-5 months

Complex projects or difficult sites may extend these timelines.

Permit Validity and Extensions

Building permits remain valid for three years from issuance. Construction must commence (defined as foundation work beginning) within this period.

Extensions require application before expiry. Municipalities generally approve extensions unless regulations have changed significantly.

Permits become invalid if:

  • Construction doesn’t start within three years
  • Work stops for more than three years
  • Permitted design is significantly violated during construction

Working with Professionals

Our architecture services provide complete permit documentation including:

  • All architectural drawings and specifications
  • Coordination with structural engineers and specialists
  • Utility coordination management
  • Submission and review process management
  • Revision handling if required

Professional management significantly reduces rejection risk and timeline delays. Contact us to discuss your permit requirements.